Christiana Care Bone Marrow Air Handling Unit Replacement

In the penthouse, two existing air handling units are located in an area that is not conducive for conventional replacement. The access to the units is extremely difficult. The existing units were dismantled and the new units were installed panel by panel.

Products Used:  Air Enterprises SiteBilt Units

Results:  As one of the existing units was operational for the critical environment, the second air handling unit was removed. The Air Enterprises/subcontractor Sitebilt team erected the unit in the penthouse panel by panel. Each piece was installed with the same quality of a factory constructed unit. Both units were installed within the required schedule and the Bone Marrow Critical Area was never disrupted during construction.

Ammunition Manufacturing Facility Vintage Cooling Tower Replacement

A 1974 vintage cooling tower needed to be replaced. ETSI teamed up with the contractor to design a solution that would fit the existing footprint and increase capacity.

Products Used:  Evapco USS Cooling Tower

Results:  Capacity was increased by 20 percent and the cooling tower was designed to fit the existing footprint of the previous cooler.

Philadelphia Naval Yard Closed Circuit Cooler Coil Casing Replacement

The cooler provided cooling for the foundry ovens. The existing competitor coils had failed and required replacement prior to the next process requiring the ovens.

Products Used:  Evapco Coil Casing Section

Results:  Evapco designed and fabricated a custom casing section to fit the existing basin section and pipe connections. The work occurred in a two day duration meeting the customer’s schedule as well as the existing cooler capacity.